Company Name | NARA MACHINERY CO., LTD. |
---|---|
Address | 143-0002 2-5-7, Jonan-Jima, Ohta-ku, Tokyo, Japan Tel +81-3-3790-8011 Fax +81-3-3790-8055 |
Year of Establishment | 1924 |
Capital | ¥40,000,000 |
Officer | Supreme Adviser Yorioki Nara President, Representative Director Ken-ichi Johara Vice President, Representative Director, Toshifumi Nagasawa Senior Executive Director Manager, Yorikazu Kawakami Director, Manager, Manufacturing Department, Hidetoshi Iwamatsu Director, Manager, Sales Department, Osamu Maruyama Executive Officer, Hisatsugu Takashima |
Number of employees | 161 people |
Intellectual Property | Patents, Trade Marks 112 cases (Domestic, Overseas) Applying Patents, Trade Marks 8cases (Domestic, Overseas) |
Description of Business | Production & Sales of Powder Processing Equipment, Contract Manufacturing (Drying, Milling, Mixing/Granulating, Powder Surface Modification, Dust Collecting, Feeding) |
Construction Permission | Permission No: No.148535 Authorized by the Governor of Tokyo Type of Construction: Machine Installation Work |
Environmental Management System Certification | ISO14001:2015 Registry No.JP00/017274 Audit Scope: Design, manufacture and sales of powder/granule processing equipment including crusher and pulverizer, dryer, dust collector, high-speed mixer/granulator, feeder/conveyor, and machine for powder surface modification |
Quality Management System Certification | ISO9001:2015 Registry No.JP12/062367(UKAS)Audit Scope: Design and manufacture of powder/granule processing equipment (dryer, cooler, reactor and heat exchanger) |
The followings are main modes of transportation to Nara:
Take a bus (No.32 ”Jonan-Jima Junkan”) at Terminal 7th. By bus, it takes about 35 minutes from Omori Station to Nara. By Taxi, it takes about 20 minutes from Omori Station to Nara.
Take a bus (No. 32 “Jonan-Jima Junkan”). By bus, it takes about 20 minutes from Heiwajima Station to Nara. By Taxi, it takes about 15 minutes from Heiwajima Station to Nara.
Take a bus (No. 32 “Jonan-Jima Junkan”). By bus, it takes about 15 minutes from Ryutsu Center Station to Nara. By Taxi, it takes about 10 minutes from Ryutsu Center Station to Nara.